Project Schedule Optimization Package
PSOP 1.3 Trial Version
Project Schedule Optimization Package
The Project Schedule Optimization Package (PSOP) is a software add-on for the Primavera scheduling application. PSOP works seamlessly in the background of Primavera to provide unprecedented schedule optimizations, minimizing the total project duration while maintaining all the constraints and dependencies defined by the scheduler. The advanced algorithms used in the optimization process can only be found in PSOP.
Features
Results: PSOP quickly produces schedules with shorter duration and less overload than can be acheived by other means.
Seamless integration: PSOP installs itself as a drop-down option in the Tools menu.
Reporting: Results screen compares original and existing schedules, both graphically and quantitatively so you can quickly see how PSOP has improved your existing schedule.
Access to state of the art technology: The technology that underlies PSOP is protected by OTS and is unavailable elsewhere.
Works with Primavera Enterprise 4.1 & 5.0.
حمل من هنا :
http://www.otsys.com/cgi-bin/evalLicenseRequest.py
عليك التسجيل اولا
This screenshot compares PSOP and Primavera (with default options) leveled schedules. On this project (construction of an airplane wing), PSOP produces a schedule that is 27% shorter and has no overload (it removes all the overload in the Primavera schedule):
موقع البرنامج:
http://www.primaverauk.com/terms.htm
حمل من المرفقات
-----------------------------------
Project Schedule Optimization Package
PSOP 1.3 Trial Version
Project Schedule Optimization Package
The Project Schedule Optimization Package (PSOP) is a software add-on for the Primavera scheduling application. PSOP works seamlessly in the background of Primavera to provide unprecedented schedule optimizations, minimizing the total project duration while maintaining all the constraints and dependencies defined by the scheduler. The advanced algorithms used in the optimization process can only be found in PSOP.
Features
Results: PSOP quickly produces schedules with shorter duration and less overload than can be acheived by other means.
Seamless integration: PSOP installs itself as a drop-down option in the Tools menu.
Reporting: Results screen compares original and existing schedules, both graphically and quantitatively so you can quickly see how PSOP has improved your existing schedule.
Access to state of the art technology: The technology that underlies PSOP is protected by OTS and is unavailable elsewhere.
Works with Primavera Enterprise 4.1 & 5.0.
حمل من هنا :
http://www.otsys.com/cgi-bin/evalLicenseRequest.py
عليك التسجيل اولا
This screenshot compares PSOP and Primavera (with default options) leveled schedules. On this project (construction of an airplane wing), PSOP produces a schedule that is 27% shorter and has no overload (it removes all the overload in the Primavera schedule):